info@cinosourcing.com
TEST 01Why one sheet instead of a conversation
Suppliers answer the question they are asked. If two workshops receive two different briefs, the cheaper offer is usually the one that quietly dropped a line.
| ITEM | FIELD THE BUYER STATES | WHY IT GOES IN THE FILE |
|---|---|---|
| PRODUCT | Line item, family and reference drawing or datasheet | Stops a quote from silently substituting a different package or interface. |
| OPTICAL | Pixel pitch, module resolution, package, brightness and refresh target | Fixes the panel count, load schedule and control settings. |
| CONTROL | Control platform, interface, scan mode and mapping file | Prevents a receiving card that cannot drive the chosen module. |
| POWER | Rail voltage, connector schedule and derating assumption | Makes cabinet-level power comparable between offers. |
| VOLUME | Quantity tiers per line item plus a spare ratio | Separates repeat stock from a one-off project schedule. |
| MARKET | Destination, voltage, plug and language of documents | Determines the file set and the acceptance checklist. |
TEST 02Attachments that make the sheet quotable
Text is not enough for a display project. Three attachments do most of the work, and none of them needs to be a formal engineering package.
TEST 03The one-line answer to most RFQ problems
When a quote comes back far below the others, the reason is almost always a missing field rather than a better price.
A sourcing partner is most useful at this point, because the sheet has to be sent to several workshops in identical form and then defended when the answers differ. We do not publish prices, minimums or lead times on a landing page: those are outputs of a quotation built from the buyer's quantity tiers. What we can do is hold the field set still while the offers come in, so the comparison is real.
TEST 04Commercial fields that stay in the quotation
Some fields belong in the RFQ as requirements and not on a public page. Keeping them in the quote protects both sides.
TEST 05From sheet to approved sample
The RFQ is not finished when quotes arrive. It is finished when one specification has a physical reference that the batch will be judged against.
TEST 06Keep the whole file under one reference
The sheet is the index for everything that follows. Sample, batch record, configuration file, inspection evidence and carton list all point back to it.
This is also why we avoid quoting from a screenshot or a single message. A display order has too many interdependent lines for that: a change in module package moves the control settings, a change in panel count moves the power schedule, and a change in either moves the spare kit. One reference number, one revision history and one set of attachments make the file auditable months later, when somebody who did not place the order has to restock a part.
TEST 07Questions buyers ask before the PO
What is the single most-missed field on a display RFQ?
The control interface and scan mode. Buyers specify a pitch and a screen size, then discover the receiving card cannot drive the chosen module. The compatibility checklist closes that gap.
Do I need a full engineering drawing?
Not at the first step. A screen dimension sketch, cabinet layout or an existing mapping file is usually enough to make the sheet quotable. The drawing is refined before the golden sample.
Should I include a spare ratio in the RFQ?
Yes. Stating it as a ratio of each line item makes the same-batch allocation explicit and keeps the spare kit comparable between offers. The batch post explains why.
Why will you not show prices on this sheet?
Prices, minimums and scheduling are outputs of a quotation built from your quantity tiers and destination. Publishing invented numbers here would make the comparison worse, not better.
Can the same sheet be reused for a restock order?
Yes, with the original order reference and batch record attached. A restock should be quoted against the installed wall so replacements match.
Who receives the sheet?
It goes in identical form to each verified workshop, and the answers are compared line by line. One specification, one sample, one inspection file.