LED Display RFQ Specification Sheet China | Fields Buyers Miss
For wholesale and OEM buyers, the fastest way to get comparable quotes is a single sheet, not ten emails. This RFQ field sheet lists what a display parts enquiry must state, which attachments make it quotable, and the gaps that most often turn a project into a re-quote.
SEND THE BOM
Pixel pitch, module format, control platform, quantity tiers and destination. One BOM, one quote, one inspection file.
+86 186 7676 3055
info@cinosourcing.com
T1BRIEF
T2BOM
T3MATCH
T4TEST
T5LOAD

TEST 01Why one sheet instead of a conversation

Suppliers answer the question they are asked. If two workshops receive two different briefs, the cheaper offer is usually the one that quietly dropped a line.

MINIMUM VIABLE RFQ FIELDS
ITEM FIELD THE BUYER STATES WHY IT GOES IN THE FILE
PRODUCT Line item, family and reference drawing or datasheet Stops a quote from silently substituting a different package or interface.
OPTICAL Pixel pitch, module resolution, package, brightness and refresh target Fixes the panel count, load schedule and control settings.
CONTROL Control platform, interface, scan mode and mapping file Prevents a receiving card that cannot drive the chosen module.
POWER Rail voltage, connector schedule and derating assumption Makes cabinet-level power comparable between offers.
VOLUME Quantity tiers per line item plus a spare ratio Separates repeat stock from a one-off project schedule.
MARKET Destination, voltage, plug and language of documents Determines the file set and the acceptance checklist.
A sheet with these six blocks can be compared line by line. The BOM comparison note explains the method.

TEST 02Attachments that make the sheet quotable

Text is not enough for a display project. Three attachments do most of the work, and none of them needs to be a formal engineering package.

RFQ ATTACHMENT LIST
Drawing
Cabinet layout or screen dimension sketch with the module mounting pattern.
Mapping
Existing configuration or screen layout file if the order is a replacement or extension.
Photo set
Images of an installed wall or a previous approved sample where a match is required.
Document list
Certificate requests, label language and manual requirements by destination.
Schedule
Desired delivery phasing described qualitatively, without invented dates.
Attachments are filed under the same reference as the sheet so a later revision can be traced. The drawing handover note covers the format.

TEST 03The one-line answer to most RFQ problems

When a quote comes back far below the others, the reason is almost always a missing field rather than a better price.

ONE-LINE ANSWER
Freeze the specification first; compare quotes second; approve a golden sample third.
That order is the whole method. The line sheet RFQ checklist applies the same logic to a wholesale product range.

A sourcing partner is most useful at this point, because the sheet has to be sent to several workshops in identical form and then defended when the answers differ. We do not publish prices, minimums or lead times on a landing page: those are outputs of a quotation built from the buyer's quantity tiers. What we can do is hold the field set still while the offers come in, so the comparison is real.

TEST 04Commercial fields that stay in the quotation

Some fields belong in the RFQ as requirements and not on a public page. Keeping them in the quote protects both sides.

IN THE SHEET
Requirements: specification, quantity tiers, spare ratio, destination, document list and acceptance rule. These describe what has to be true.
IN THE QUOTE
Commercial terms: pricing, minimums, scheduling, payment structure and validity. These are built from the sheet, not guessed in advance.
The boundary is deliberate. The warehouse equipment RFQ sheet uses the same split.

TEST 05From sheet to approved sample

The RFQ is not finished when quotes arrive. It is finished when one specification has a physical reference that the batch will be judged against.

FIVE GATES AFTER THE SHEET IS SENT
01
Compare
Offers lined up field by field, with substitutions written down. Comparison method
02
Select
Supplier verified against the specification and the workshop record. Verification note
03
Sample
Golden sample approved, photographed and labelled. Approval gates
04
Freeze
Revision note issued for any change in bin, drive, mask, interface or firmware.
05
Release
Production starts against the frozen sheet and the approved sample.
The inspection evidence that follows is described in the pre-shipment report.

TEST 06Keep the whole file under one reference

The sheet is the index for everything that follows. Sample, batch record, configuration file, inspection evidence and carton list all point back to it.

This is also why we avoid quoting from a screenshot or a single message. A display order has too many interdependent lines for that: a change in module package moves the control settings, a change in panel count moves the power schedule, and a change in either moves the spare kit. One reference number, one revision history and one set of attachments make the file auditable months later, when somebody who did not place the order has to restock a part.

RELATED READING / RFQ FILE
Pillar
Read LED display components sourcing before the BOM is frozen.
Index
The file behind this step is parts category index.
Modules
Buyers usually pair this with module wholesale family.
Control
Keep control system family in the same order folder.
Power
A deeper working note sits in power supply family.
Batch
This is the same discipline used in batch consistency and spares.
Inspection
Cross-check the wording against pre-shipment inspection report.
Consolidation
For the wider sourcing map, see consolidated project shipment.
Specification
The checklist version is custom product specification sheet.
BOM
Add BOM and component sourcing to the RFQ attachment list.

TEST 07Questions buyers ask before the PO

What is the single most-missed field on a display RFQ?

The control interface and scan mode. Buyers specify a pitch and a screen size, then discover the receiving card cannot drive the chosen module. The compatibility checklist closes that gap.

Do I need a full engineering drawing?

Not at the first step. A screen dimension sketch, cabinet layout or an existing mapping file is usually enough to make the sheet quotable. The drawing is refined before the golden sample.

Should I include a spare ratio in the RFQ?

Yes. Stating it as a ratio of each line item makes the same-batch allocation explicit and keeps the spare kit comparable between offers. The batch post explains why.

Why will you not show prices on this sheet?

Prices, minimums and scheduling are outputs of a quotation built from your quantity tiers and destination. Publishing invented numbers here would make the comparison worse, not better.

Can the same sheet be reused for a restock order?

Yes, with the original order reference and batch record attached. A restock should be quoted against the installed wall so replacements match.

Who receives the sheet?

It goes in identical form to each verified workshop, and the answers are compared line by line. One specification, one sample, one inspection file.

Send the BOM, not a product photo
Pixel pitch and module format, control platform and interface, brightness and refresh target, quantity tiers, spare ratio and destination are enough to start. WhatsApp +86 186 7676 3055 · info@cinosourcing.com
TEST FIELD / SIGN-OFFOne specification, one batch reference, one inspection file.WhatsApp +86 186 7676 3055info@cinosourcing.com
CINOSOURCING · China sourcing, QC and freight for wholesale, OEM and project buyers since 2019 · https://www.cinosourcing.com/

Leave a Comment

Your email address will not be published. Required fields are marked *