For wholesale and project buyers, compatibility is checked before the purchase order, not on site. This checklist walks the signal chain from source to panel and names the six fields that have to agree in writing before a control line is released to production.
SEND THE BOM
Pixel pitch, module format, control platform, quantity tiers and destination. One BOM, one quote, one inspection file.
+86 186 7676 3055
info@cinosourcing.com
T1BRIEF
T2BOM
T3MATCH
T4TEST
T5LOAD

TEST 01Walk the chain before you compare quotes

A control system is a chain of constraints. Approving one link in isolation is how a wall ends up with the right parts and no picture.

SOURCE TO PANEL / FIVE CONSTRAINTS
LINK 1
SOURCE
Player or processor output format and resolution.
LINK 2
SEND
Sending box sized to the whole screen layout.
LINK 3
RECEIVE
Card chosen against module interface, scan mode and pixel load. Receiving card listing
LINK 4
HUB
Board and ribbon harness matched to the module connector pinout.
LINK 5
PANEL
Module driven by the approved configuration file.
A change at either end invalidates the middle. The control family page describes the purchase order view.

TEST 02Six fields that must agree in writing

These are the fields we ask for before a control line is released. If one is missing, the quote is not yet comparable.

COMPATIBILITY FIELD SET
INTERFACE
Module connector type, pin count, HUB routing and connector gender.
RESOLUTION
Pixels per module and the expected load on each receiving card.
SCAN MODE
Scan setting recorded against the module datasheet and the configuration file.
HARNESS
Ribbon and DC cable lengths and routing inside the cabinet.
MAPPING
Cabinet order, port order, screen resolution and offset as one numbered file.
FIRMWARE
Software and firmware revision that produced the mapping file.
The same six fields appear in the RFQ sheet under the control block.

TEST 03The release checklist

Run this before production. It is short on purpose: every item has to be a record, not a verbal assurance.

CONTROL RELEASE GATES
Interface
Module and HUB connector schedule photographed on the approved sample.
Drive
Receiving card drives the actual module type with the approved configuration loaded.
Content
Full white, full colour, greyscale and moving content run on a test rig.
Layout
Every cabinet port verified against the numbered mapping file.
Revision
Firmware and configuration revision written into the order file.
Spare
At least one configured spare card recorded by batch and revision.
Evidence is filed as described in the inspection report.

TEST 04What goes into the configuration handover

The file is part of the deliverable. A technician replacing a card two years later needs to restore a known state, not rebuild the screen from scratch.

CONFIGURATION HANDOVER
ITEM FIELD THE BUYER STATES WHY IT GOES IN THE FILE
FILE NAME Project reference, screen identifier and revision number Identifies the exact configuration installed on the wall.
SOFTWARE Control software and firmware revision used to generate it Stops a new card from reading an old layout.
LAYOUT Cabinet order, port order, resolution and offset The map a technician follows during a swap.
BACKUP Copy held with the inspection file and the spare kit Turns a service call into a restore.

TEST 05Spare cards are configured parts

A bare receiving card with no matching file is only half a spare. The same applies to a HUB board with a different pinout.

CONTROL SPARE KIT
CARDS
Receiving cards from the same run, labelled by batch reference.
BOARDS
HUB boards with the identical connector routing.
HARNESS
Ribbon and DC cables at the cabinet drawing lengths.
FILES
Mapping, configuration and firmware revision on one register.
REGISTER
Carton-level list held with the shipment file.
The kit is consolidated with the wall as described in the project shipment post.

TEST 06When the buyer is also buying other hardware

Control-room and broadcast projects often run one procurement file across display, server and interconnect families. The document discipline is shared even though the parts are not.

SHARED FILE, DIFFERENT PARTS
DISPLAY
This cluster: modules, control, power and cabinet hardware.
COMPUTE
Racks, optical links and AI hardware. AI data centre hardware
INTERCONNECT
Coaxial and high-speed interconnect. Connector RFQ sheet
METHOD
Golden sample, revision register, functional test, one load. BOM comparison
One reference number across the file keeps a mixed project auditable.
RELATED READING / COMPATIBILITY FILE
Pillar
Read LED display components sourcing before the BOM is frozen.
Index
The file behind this step is parts category index.
Modules
Buyers usually pair this with module wholesale family.
Control
Keep control system family in the same order folder.
Power
A deeper working note sits in power supply family.
RFQ
This is the same discipline used in RFQ specification sheet.
Inspection
Cross-check the wording against pre-shipment inspection report.
Listing
For the wider sourcing map, see receiving card listing.
Test plan
The checklist version is PCBA inspection and test plan.
Test report
Add interconnect test report to the RFQ attachment list.

TEST 07Questions buyers ask before the PO

Can I use a control card from a different supplier?

Only if the interface, scan mode, pixel load, mapping and firmware revision are confirmed against the actual module type and recorded as a revision before production.

Do you list control brands in the checklist?

No. The checklist works from interface and configuration fields. Generic terms such as HUB75 and scan mode are industry vocabulary, not a brand endorsement.

What is the most common commissioning failure?

A receiving card that powers on but drives the wrong scan mode or load. The only reliable prevention is a drive test with the actual module type before packing.

Why does firmware revision matter for spares?

A new card running a different revision may not reproduce the original mapping. Recording the revision with the configuration file makes a later swap predictable.

Is the mapping file part of the shipment?

It is part of the order file and the site handover, stored with the inspection evidence and the spare register. The consolidated shipment post describes the handover.

What should I send to start a compatibility check?

The module specification, connector schedule, screen layout or mapping file, and the quantity tiers. If it is an extension of an existing wall, send the original order reference too.

Send the BOM, not a product photo
Pixel pitch and module format, control platform and interface, brightness and refresh target, quantity tiers, spare ratio and destination are enough to start. WhatsApp +86 186 7676 3055 · info@cinosourcing.com
TEST FIELD / SIGN-OFFOne specification, one batch reference, one inspection file.WhatsApp +86 186 7676 3055info@cinosourcing.com
CINOSOURCING · China sourcing, QC and freight for wholesale, OEM and project buyers since 2019 · https://www.cinosourcing.com/

Leave a Comment

Your email address will not be published. Required fields are marked *