RF Connector RFQ Specification Sheet: 12 Fields To Send A China Supplier

SIGNAL BENCHRF & HIGH-SPEED INTERCONNECT / CH 02WhatsApp +86 186 7676 3055info@cinosourcing.com
02
CHANNEL
SIGNAL BENCH / RFQ WORKSHEET
RF Connector RFQ Specification Sheet: 12 Fields To Send A China Supplier
For wholesale and OEM buyers, the fastest quote is the one that needs no second email. Most RF connector enquiries stall because the brief names an interface but omits the acceptance criteria. This worksheet lists the twelve fields that let a factory quote the same thing twice, and lets you compare two offers on one sheet. It is the working companion to the RF interconnect pillar and the coaxial connector page.
RFQ CHANNEL
Send the drawing, interface list and quantity tiers. One specification, one quote, one inspection file.
+86 186 7676 3055
info@cinosourcing.com
CH 01SPEC
CH 02SOURCE
CH 03SAMPLE
CH 04TEST
CH 05LOAD

S01Why a complete sheet shortens quoting

A supplier reading only an interface name has to guess the cable, the plating, the operating band and the acceptance method. Two factories will guess differently, and the cheaper quote is usually the one that assumed less. A written specification sheet removes that gap before any price is discussed.

ONE-LINE ANSWEROne sheet, several factories, one comparison. The sheet is the deliverable; the quote is the result.
FIELDS
12
QUOTE BASIS
One sheet
SAMPLE
Signed
RECORD
Per lot

S02Interface and gender

FIELD 01
Series and variant: SMA, N, BNC, TNC, MMCX, SMP, precision series or power interfaces. See the category index.
FIELD 02
Gender and polarity at both ends, including reverse-polarity variants where applicable.
FIELD 03
Mounting style: cable plug, bulkhead jack, PCB mount, right angle or panel mount.
FIELD 04
Cable type, diameter, impedance and the attachment method for each end.

S03Electrical acceptance criteria

PARAMETER BOARD / FILL FROM YOUR DRAWING
FIELD 05
System impedance and the operating frequency band the assembly will actually see.
FIELD 06
VSWR or return-loss acceptance limit, written as a number your incoming inspection can check.
FIELD 07
Insertion-loss acceptance limit at the stated band and length.
FIELD 08
Any power-handling, shielding or phase-stability requirement from the system design.

These are acceptance lines, not performance promises from us. Measured values belong in the test record; we do not publish figures or issue compliance conclusions.

S04Mechanical and environmental lines

MECHANICAL / ENVIRONMENTAL FIELDS
Field What to state Where it is recorded
FIELD 09 Length and tolerance Finished length and the measuring reference point Approved drawing revision
FIELD 10 Orientation Right-angle clocking, keying, strain relief Golden sample photo
FIELD 11 Environment Temperature, sealing, vibration, plating Specification sheet
FIELD 12 Commercial Quantity tiers, packing unit, label, destination Purchase order and packing list

S05Quantity tiers and packaging

Tiers, not a single number
State a qualification batch and a repeat volume. It lets the factory quote the same process at both levels instead of pricing a one-off.
Packing as a spec line
One assembly per bag or a kit per carton, buyer part number, lot reference and carton mark. Custom packaging belongs in the sheet, not in a later email.

Larger equipment orders use the same structure in the equipment specification template, and distributor assortments use the line sheet checklist.

S06What we return with the quote

01
Factory options quoted against the same twelve fields, with assumptions listed.
02
A sample plan with the approval record and retention location.
03
The inspection scope: which lines are measured, which are visual, and who receives the record.
04
A consolidation note showing how the lines share one packing list and carton mark set.
05
The document boundary for your market, referencing electronics documentation.
06
A revision number so the repeat order calls the same approved sample.

Where a BOM line carries substitution or end-of-life exposure, we add component risk checks before the first production run. Project orders that mix these parts with racks and optical hardware are covered in consolidated shipment planning.

BUYER QUESTIONS
Can I send a photo instead of the sheet?

You can start with a photo, but we convert it into the twelve fields and get your confirmation before quoting.

Who sets the acceptance limits?

Your engineering or incoming-inspection team. We record them and ask the factory to quote against them.

Do I need all twelve fields for a repeat order?

No. A repeat order calls the approved revision number and the new quantity tier.

Can the sheet cover several connector families?

Yes. List each interface pair as its own line on the same sheet.

What if the factory proposes an alternative?

It is recorded as a change and goes back through sample approval before production.

Where do I send it?

Use the contact block at the top or bottom of this page with your drawing and quantity tiers attached.

Send the specification, not a product photo
Interface type and gender, cable type and length, operating frequency, quantity tiers and destination are enough to start. WhatsApp +86 186 7676 3055 · info@cinosourcing.com
CINOSOURCING · China sourcing, QC and freight for wholesale, OEM and project buyers since 2019 · https://www.cinosourcing.com/

Leave a Comment

Your email address will not be published. Required fields are marked *