S01What a golden sample actually fixes
It does not replace the RFQ specification sheet. The sheet states the acceptance lines; the sample shows the physical interpretation of those lines.
S02The approval record
S03What counts as a change
S04Re-approval triggers
A change does not have to be large to matter. If the buyer cannot tell from the documents whether the second batch matches the first, it is a change. We write the trigger list into the order file so the factory knows which decisions require a written sign-off. The same approach is used for electronics manufacturing and for mixed cable assembly runs.
S05Keeping the lot tied to the sample
| Record | Tied to | Why it matters |
|---|---|---|
| Sample ID | Drawing revision | Confirms which physical reference applies |
| Cable lot | Production batch | Explains a measured difference |
| Connector lot | Production batch | Traces plating and contact finish |
| Test record | Purchase order | Confirms the acceptance lines were checked |
| Packing list | Carton marks | Keeps receiving inspection unambiguous |
S06Buyer checklist before the balance
For tooling-based circular connectors the same discipline applies to contact layout and keying: circular connectors. For high-speed backplane parts, the loading pattern is the equivalent of the golden sample: backplane connectors.
Is a photo enough for approval?
A dated photo set is part of the record, but a physical retained sample is what receiving inspection compares against.
Who keeps the golden sample?
The retention location is agreed in the order file before production starts.
Can we skip re-approval for a label change?
No. Any label or carton change updates the packing specification and needs written confirmation.
What if the factory changes the cable lot?
That is a change trigger. The new lot is recorded and the measured values are compared before release.
Does this apply to project orders too?
Yes, especially where the assembly ships with racks or optical hardware on one PO.
How long does approval take?
Timing depends on the configuration and the sample plan. Nothing is produced before written sign-off.