LED Display Parts Category Index | Wholesale Sourcing Map

TEST FIELDLED DISPLAY COMPONENTS / FIELD 02

WhatsApp +86 186 7676 3055info@cinosourcing.com

CATEGORY INDEX / MAP
LED Display Parts Category Index | Wholesale Sourcing Map
Use this index when the wholesale order has more than one part family. It maps each family to the specification that controls it and to the file that proves it. The pillar page covers the whole order; the family pages below go deeper on the parts themselves.
SEND THE BOM
Pixel pitch, module format, control platform, quantity tiers and destination. One BOM, one quote, one inspection file.
+86 186 7676 3055
info@cinosourcing.com
T1BRIEF
T2BOM
T3MATCH
T4TEST
T5LOAD

TEST 01How to read this index

The left column is what you are buying, the right column is the document that has to exist before the line item is released to production.

FAMILY TO CONTROLLING DOCUMENT
MODULE
Specification sheet plus a golden sample and a batch reference. Module family page
CONTROL
Interface and mapping file, firmware revision and a functional test record. Control family page
POWER
Load schedule, rail voltage, connector schedule and a derating note. Power family page
CABINET
Mechanical drawing, fastener and cable schedule, spare kit list. Cabinet spares page
SPARES
Same-batch allocation, carton labels and a replacement register.
A line item without a controlling document is a line item that will be quoted differently by every workshop. The specification sheet guide shows the minimum field set.

TEST 02Choose by application, not by part name

Two buyers asking for the same module often need very different service stock. Start with where the screen lives.

APPLICATION TO FIRST DECISION
Rental stage
Fast service, rugged cabinet hardware and a spare kit per touring case. Cabinet spares comes first.
Retail façade
Brightness, weather protection and a maintenance path from the front or rear.
Control room
Fine pitch, greyscale, refresh and a stable configuration file. The AI hardware cluster often shares the buyer.
Broadcast studio
Camera-facing refresh behaviour, colour consistency across the full wall.
DOOH network
Repeat stock by site, matched spares and a rollout schedule across markets.
Fixed corporate
One-time project schedule with a long-tail spare register for later service.
This is a qualitative map, not a ranking. We do not claim monthly search volumes or difficulty scores for any of these terms.

TEST 03The module family

The module determines most of the remaining order: cabinet count, receiving card count, power load and how a future replacement will look.

MODULE FIELDS THAT DRIVE THE REST OF THE BOM
PITCH
Nominal pitch and module physical resolution set the total panel count.
PACKAGE
SMD, COB, GOB and DIP each have a different service and protection approach.
SCAN
Scan mode and drive configuration must agree with the receiving card output.
DUTY
Indoor or outdoor duty changes brightness target, sealing and thermal plan.

TEST 04The control chain

A display is a signal chain. A change at either end invalidates the middle, so the configuration file is part of the purchase order.

SOURCE TO PANEL / FIVE LINKS
LINK 1
SOURCE
Player or processor, input format and output resolution.
LINK 2
SEND
Sending box or controller sized to the whole screen layout.
LINK 3
RECEIVE
Receiving card chosen against the module interface and scan mode. Receiving card listing
LINK 4
HUB
HUB board and ribbon harness match the module connector and pinout.
LINK 5
PANEL
Module driven by the approved configuration file and mapping.
Compatibility is the subject of the control compatibility checklist; never approve a control card from a name alone.

TEST 05Power, cabinet hardware and spares

These lines are easy to treat as accessories and expensive to get wrong. They are where a project order becomes serviceable or becomes a returns problem.

BEFORE THE ACCESSORY LINES ARE RELEASED
Load schedule
Module quantity per cabinet, rail voltage, connector type and derating assumption written down.
Cable schedule
DC harness lengths, ribbon cable count and connector pinout agreed across suppliers.
Mechanical
Cabinet frame, mask, magnet, fastener and service tool list matched to the drawing.
Spare kit
Spare modules, receiving cards, power units and cables drawn from the same batch.
Carton marks
Every carton labelled by line item and batch so site receiving is not a guessing game.
See the power supply page and the cabinet spares page for the two family views.

TEST 06Document trail for every family

The index is only useful if it closes back into the order file. These are the five records that travel with a consolidated shipment.

FIVE RECORDS, ONE REFERENCE NUMBER
Q1
Q1 / RFQ
Frozen specification sheet with quantity tiers and spare ratio. RFQ sheet
Q2
Q2 / SAMPLE
Golden sample, approval note and engineering change register. Approval gates
Q3
Q3 / BATCH
LED bin, drive configuration and same-batch spare allocation. Batch consistency
Q4
Q4 / TEST
Ageing, functional and visual records with dated photographs. Inspection report
Q5
Q5 / LOAD
Carton list, packing list and per-market document file. Consolidated shipment
A reviewer should be able to rebuild the entire order from these five records without a single email thread.
RELATED READING / FROM THE INDEX
Pillar
Read LED display components sourcing before the BOM is frozen.
Modules
The file behind this step is module wholesale family.
Control
Buyers usually pair this with control system family.
Power
Keep power supply family in the same order folder.
Cabinet
A deeper working note sits in cabinet spare parts.
RFQ
This is the same discipline used in RFQ specification sheet.
Compatibility
Cross-check the wording against control compatibility checklist.
Inspection
For the wider sourcing map, see pre-shipment inspection.
Shenzhen
The checklist version is industrial cluster index.
BOM
Add BOM and component sourcing to the RFQ attachment list.

TEST 07Questions buyers ask before the PO

Where do I start if I only have a screen size?

Start with the application and the intended pixel pitch, then the module format. From there the control chain, power load and cabinet hardware can be derived. The RFQ sheet gives the field order.

Can I use this index for a repeat-stock order?

Yes. Repeat stock is where the index is most useful, because the second order has to match the first batch. Keep the batch reference and the configuration file in the same folder as the new PO.

Why is there no product list with prices on this page?

Prices, minimums and lead times belong in a quotation built from your specification and quantity tiers. Publishing invented numbers here would be misleading; the index exists to make quotes comparable.

Which family most often causes a delay?

Control compatibility. A receiving card, HUB board or configuration file that does not match the module interface stops the whole wall. The compatibility checklist is written for exactly this.

Do you link to the older LED lighting pages?

Those pages serve lighting, therapy and solar products, a different buyer and a different term family. We keep them separate so the two clusters do not compete for the same queries.

Who do I contact with a BOM?

Send the parts list, quantity tiers and destination to WhatsApp +86 186 7676 3055 or info@cinosourcing.com. One BOM, one quote, one inspection file.

Send the BOM, not a product photo
Pixel pitch and module format, control platform and interface, brightness and refresh target, quantity tiers, spare ratio and destination are enough to start. WhatsApp +86 186 7676 3055 · info@cinosourcing.com
TEST FIELD / SIGN-OFFOne specification, one batch reference, one inspection file.WhatsApp +86 186 7676 3055info@cinosourcing.com
CINOSOURCING · China sourcing, QC and freight for wholesale, OEM and project buyers since 2019 · https://www.cinosourcing.com/

Order-stage reading: RFQ specification sheet · batch consistency and spares · control compatibility checklist · pre-shipment inspection report · consolidated project shipment
Product dossiers: indoor fine pitch module · HUB75 receiving card · 5V switching power supply