CONTROL LISTING / CARD DOSSIER
HUB75 LED Display Receiving Card | Wholesale From China
For wholesale and project buyers, a receiving card is not a generic spare.
This dossier sets out the signal chain, the interface and mapping fields, the configuration handover and the functional test that a production quantity has to pass before it is packed.
SEND THE BOM
Pixel pitch, module format, control platform, quantity tiers and destination. One BOM, one quote, one inspection file.
+86 186 7676 3055
info@cinosourcing.com
TEST 01Where the card sits in the signal chain
The receiving card is the link between the controller and the module. Its output has to match the panel, not just the box upstream.
SOURCE TO PANEL / FIVE LINKS
LINK 1
SOURCE
Media player or processor, output format and resolution.
LINK 2
SEND
Sending box sized to the full screen layout.
LINK 3
RECEIVE
Card chosen against interface, scan mode and pixel load.
Control family
LINK 4
HUB
HUB board and ribbon harness matched to the module pinout.
LINK 5
PANEL
Module driven by the approved configuration file.
A change at either end is a revision.
Change control explains the register.
TEST 02Compatibility fields to confirm in writing
Approving a card from a name alone is the most common commissioning failure in this category.
CARD / MODULE FIELD SET
INTERFACE
Module connector type, pin count, HUB routing and connector gender.
RESOLUTION
Pixels per module and the expected load on each card.
SCAN MODE
Scan setting recorded against the module datasheet and the configuration file.
HARNESS
Ribbon and DC cable lengths and routing inside the cabinet.
MAPPING
Cabinet order, port order, screen resolution and offset as one numbered file.
FIRMWARE
Software and firmware revision that produced the mapping.
TEST 03Release gates before production
Every item below has to be a record, not a verbal assurance. The drive test is the one that cannot be skipped.
CARD RELEASE CHECKS
Interface
Module and HUB connector schedule photographed on the approved sample.
Drive
Card drives the actual module type with the approved configuration loaded.
Content
Full white, full colour, greyscale and moving content run on a test rig.
Layout
Every cabinet port verified against the numbered mapping file.
Revision
Firmware and configuration revision written into the order file.
TEST 04Two halves of a configured spare
A bare card with no matching file is only half a spare. The handover has to include both.
HARDWARE
Receiving card from the same production run, labelled by batch reference, plus a matching HUB board and harness.
FILE
Mapping, configuration and firmware revision on one register, held with the inspection file and the spare kit.
A technician should be able to restore a known state rather than rebuild the screen.
The shipment post covers the handover.
TEST 05From sample to packed load
The card is bought as part of a matched set of parts. Its batch and revision travel with the wall.
ORDER SEQUENCE
01
Specify
Interface, scan mode, pixel load and mapping fields frozen in the BOM.
03
Test
Drive test on the actual module type with dated photographs.
04
Allocate
Configured spare cards labelled by batch and revision.
05
Load
Consolidated with modules, power and hardware under one reference.
TEST 06Related hardware in the same procurement file
Control-room and visualisation projects often buy several hardware families at once. The document discipline is shared even though the parts are not.
SHARED FILE, DIFFERENT PARTS
Q1
Q1 / DISPLAY
Modules, control, power and cabinet hardware.
Pillar page
One reference number across the file keeps a mixed project auditable.
RELATED READING / CARD DOSSIER
TEST 07Questions buyers ask before the PO
Will this card work with my modules?
Only after the interface, scan mode, pixel load, harness pinout and configuration file are confirmed against the actual module type. The compatibility checklist is the working version.
Are control brand names listed here?
No. The dossier works from interface and configuration fields. HUB75 and scan mode are industry interface terms, not an endorsement of a supplier.
Does the spare card come configured?
It is allocated from the same run and recorded with the mapping, configuration and firmware revision, so a site swap restores a known state.
Is a drive test really needed?
Yes. A card that powers on but drives the wrong scan mode or load is a commissioning failure. The test rig uses the actual module type.
Are images included in this listing copy?
No. This body contains no image URLs or media references. Upload your own product photographs in the WordPress media library.
Can the card ship with the rest of the wall?
Yes. It is normally consolidated with modules, power units, harnesses and the spare kit under one carton list and one inspection file.
Send the BOM, not a product photo
Upload your own images in the media library; this listing copy contains no image URLs.
CINOSOURCING · China sourcing, QC and freight for wholesale, OEM and project buyers since 2019 · https://www.cinosourcing.com/
Reviews
There are no reviews yet.