TEST 01Start with the load schedule
A supply is sized from the wall, not from a product title. The schedule has to exist before any unit is quoted or any harness is cut.
TEST 02Rail voltage, form factor and connector schedule
The physical format and the connector pinout decide whether a supply can actually be swapped in a cabinet during a service call.
| ITEM | FIELD THE BUYER STATES | WHY IT GOES IN THE FILE |
|---|---|---|
| OUTPUT | Rail voltage, rated output and the number of output terminals | Sets the DC harness and the number of panels each unit feeds. |
| FORM | Physical dimensions, mounting pattern and airflow direction | Must fit the cabinet drawing and the service clearance. |
| INPUT | AC input range, frequency and inlet type | Matched to the destination market and the site distribution plan. |
| HARNESS | DC cable length, gauge, connector type and polarity | A different connector makes a spare unit unusable on site. |
| PROTECTION | Protection behaviour required in the specification | Recorded as a requirement, never invented as a claim. |
TEST 03Risks that appear only after the wall is lit
Power problems rarely show up in a carton inspection. They show up at full white content, in a warm cabinet, or after a spare unit is fitted.
TEST 04Verification records for the power line
A supply is accepted against the approved specification, not against a catalogue screenshot. The evidence should be readable by the site team.
TEST 05Power spares and the restock plan
Power units are the most frequently swapped service part on a wall, so their spare allocation has to be as controlled as the module batch.
TEST 06Buying power alongside the rest of the wall
Power is rarely ordered alone. In a project order it is one line in a mixed-SKU load, which is why the carton list and the specification share a single reference number.
TEST 07Questions buyers ask before the PO
Do you publish wattages or prices on this page?
No. The rail voltage, rated output and quantity are derived from your module specification and cabinet plan. Those numbers belong in an approved quotation, not in a landing page.
Can the power units be shipped with modules and control cards?
Yes, that is the normal shape of a project order. They are consolidated into one load with a shared carton list, batch references and one inspection file.
How do you avoid a spare unit that does not fit?
The connector type, polarity, form factor, mounting pattern and harness length are frozen in the specification and checked on the golden sample before production.
What about different mains standards by market?
Voltage, frequency, inlet and plug configuration, plus the language of labels and documents, are confirmed per destination before the order is released. The per-market document note explains the file.
Do you claim any certification on the supplies?
We record the certificate requests stated by the buyer and verify the documents supplied against the approved specification. We do not publish certificate numbers or make compliance declarations on a landing page.
Is a repeat-stock order handled differently?
It is quoted against the installed specification and the original batch reference, so the second shipment uses the same connector schedule and form factor as the wall already in service.