Buying a custom component is buying a manufacturing process, an interpretation of the drawing and repeatable quality at the same time. Four questions decide whether the quotes that come back are worth comparing.

QUESTION 01
Why is a drawing not yet an RFQ package?

A drawing describes the part. An RFQ package also fixes the revision, material and finish, critical characteristics, annual volume and batch sizes, inspection requirements, packaging and the documents your program requires. Without those, each supplier quietly prices a different assumption. The 12-item RFQ checklist is the short version.

QUESTION 02
What makes two quotes comparable?

The same revision, quantity, delivery point, tooling scope, inspection scope and certificate list. Every supplier exception is written down rather than discovered later. Landed cost on CNC parts shows the fields that move the total beyond the unit price.

QUESTION 03
How do we match a supplier to the process?

By material, geometry, tolerance range, volume and equipment — not by a broad industry label. A shop that builds large welded structures is not automatically right for precision turned parts. How we verify a machining supplier and reading a quality-system claim cover the checks behind that match.

QUESTION 04
What should the first article prove?

That the sample was made with the intended material, process, tooling and site — with dimensional results, material certificates, process records and finish evidence on file. A handmade prototype is not evidence of series capability. DFM changes are worth settling before the design is frozen.

SPEC FIELDS TO FREEZE
revision  /  material  /  finish  /  tolerance  /  critical characteristics
annual volume  /  batch sizes  /  inspection  /  certificates  /  packaging

The comparison is also a design input, not just a purchasing deliverable. Once the quotes are normalised, engineering can see which requirements drive tooling and inspection cost, and decide whether a tolerance is functionally necessary before the design is frozen. DFM changes that affect cost are the practical version of that review.

Keep the released package under change control. A change to material, process, machine, tooling, site or a critical sub-supplier should require written approval and a new revision on the purchase order and inspection report — otherwise the validated state quietly drifts.

The boundary we work to

We are a sourcing agent, not a manufacturer. We do not own a factory, do not issue quality-system certificates, and do not certify parts or processes. Those belong to the factory that makes the goods. We work to the released data package in your brief, check that a supplier’s documents cover the intended site, process and revision, and keep the records on file with the order.

Short answers

Can we send only a 3D model?

You can, but the quote will be weaker. Material, finish, tolerances, inspection and packaging still need to be fixed in writing before two offers can be compared.

Do you certify the parts?

No. We are a sourcing agent, not a manufacturer. We check that the factory’s documents cover the intended site, process and revision and keep them on file with the order.

Can tooling ownership be written down?

Yes, and it should be agreed before any deposit. A reorder should not depend on a tool you paid for but do not control.

Send the released drawing package

We reply with verified factory options and a written, itemised all-in quote. See custom metal parts sourcing.

Request a Custom Parts Quote →Chat on WhatsApp →