A controlled RFQ sends the same revision and the same commercial assumptions to every shortlisted supplier. If one factory quotes a different material or leaves out an inspection report, the two numbers are not comparable. These are the fields we ask for before anything is priced.
Running the RFQ in parallel matters as much as the fields themselves. When suppliers quote against the same revision at the same time, an exception is visible while the design can still change — a tolerance that opens the supplier pool, a substitute material with better availability, or a line that should have a second source. Sequential quoting hides those signals until the schedule is already fixed.
What belongs in the comparison
Normalising these fields matters more than the headline number. Landed cost on CNC parts explains why a lower unit price can be the more expensive route once tooling, inspection and freight are aligned.
The boundary we work to
Short answers
What if a field is still open?
Mark it as open in the brief rather than letting a factory fill it in. An assumption about material or pack size changes both the price and the documents, and a quote built on it cannot be audited later.
Can we use our own RFQ template?
Yes. Send it as the released package and we will work to it. What matters is that every supplier receives the same revision and the same commercial assumptions.
Do you issue the certificates we ask for?
No. Those come from the factory that makes the part. We check that the document covers the intended site, process and revision, and keep it on file with the order.
We reply with verified factory options and a written, itemised all-in quote. See the full sourcing services.