MATCH
G01
info@cinosourcing.com
GATE 01Why a specification sheet comes before any quotation
Comparing offers that describe different goods is not comparison.
Most RFQ problems are not supplier problems. One workshop quotes a kit including cable, another quotes the same kit without it, and a third quotes a different revision. The buyer then compares three prices for three different goods. A single sheet with explicit component and revision fields removes that ambiguity before anyone spends time on a quotation.
GATE 02The six field blocks
Each block has an owner and an attachment.
| LEDGER LINE | FIELD THE BUYER STATES | WHY IT GOES IN THE FILE |
|---|---|---|
| B01 / Product | Full model code, configuration and the component list for kits. | The same code must appear on the datasheet, label, invoice and packing list. |
| B02 / Quantity | Tiers per model plus pack quantity per carton. | Carton counts on the packing list follow these tiers exactly. |
| B03 / Description | The product description the importer's agent will declare. | Freezing it early prevents a document rework round at the manifest gate. |
| B04 / Marks | Carton mark text, origin marking and label language. | Artwork is only released after this field is signed off. Case-pack specification. |
| B05 / Documents | Which conformity and transport documents the importer requires. | The buyer states them; the file records who supplies each one. Document field checklist. |
| B06 / Evidence | Inspection scope and the dated photograph list. | Agreed before the balance payment. Inspection report structure. |
GATE 03How the fields travel to the next gate
A field frozen here should not be re-typed downstream.
GATE 04Where RFQs go wrong
Five recurring mismatches and the control for each.
GATE 05A note on other destinations
The field structure travels; the destination-specific fields do not.
A specification sheet is worth maintaining as a living master rather than rewriting for each order. The second brief then changes only the tiers and the destination fields, while the descriptions, part numbers and carton marks stay stable. A restock calendar shows how that stability turns into a predictable replenishment cycle.
GATE 06Versioning the request itself
An RFQ is a document with a revision, not a message thread.
Every time a model code, pack quantity or declared description changes, the request gains a new revision and the superseded copy leaves the shared folder. Workshops should be able to state which revision they priced, and the final invoice should be traceable to one of them. Without that rule, three quotations may refer to three different specifications while all carrying the same reference. Sample approval gates rely on the same version discipline.
GATE 07Questions buyers ask before the file is released
Should the RFQ include a target price?
That is a commercial decision for the buyer. This note covers specification fields only, and no price figures appear in the content.
Who writes the declared product description?
The importer's appointed agent confirms it. The sourcing team then reuses that exact wording on the Chinese-side paperwork.
Can one sheet cover several cargo families?
Yes, if each line has its own model code, unit of sale and pack quantity. The category index shows how the families are separated.
What if a supplier offers an alternative model?
Ask for it as a clearly marked alternative, not as a silent substitution inside the same quotation. Sample approval gates explain why.
Do I need a separate document list for each market?
If the destination fields differ, yes. A per-market document file keeps the versions apart.
Does the sheet set minimum order quantities?
No. Quantity tiers are supplied by the buyer; no figures are written into the page.
