MATCH
G03
info@cinosourcing.com
GATE 01Six places, one description
List every location where the product is named.
| LEDGER LINE | FIELD THE BUYER STATES | WHY IT GOES IN THE FILE |
|---|---|---|
| L01 / Quotation | The model code and product description sent to the buyer. | It sets the wording every later document should copy. |
| L02 / Proforma | The same wording with quantity tiers and the named handover point. | A changed description here is a change request, not a tidy-up. |
| L03 / Invoice | The declared description confirmed by the importer's agent. | This is the wording that matters most at the declaration stage. |
| L04 / Packing list | Line-level detail with carton references and pack quantities. | It must reconcile with the invoice without introducing new names. |
| L05 / Label | Markings printed on the product or inner box. | A shortened model code here creates a mismatch with the datasheet. |
| L06 / Carton | Origin text, importer reference and carton number format. | One approved mark version across every workshop. Case-pack specification. |
buyer to state
buyer to state
buyer to state
buyer to state
buyer to state
buyer to state
The most common inconsistency is harmless-looking: a workshop shortens a model code on a carton because the full code does not fit the print area. At the receiving count, nobody can prove the carton contains the approved model. Deciding the abbreviating rule at the brief stage, and recording it as a field, is cheaper than re-marking a container.
GATE 02Model codes and variants
A variant is a new version, not a footnote.
GATE 03Quantities and carton references
A description can be right while the counts are wrong.
GATE 04How consistency supports the other gates
This note is the bridge between the RFQ and the inspection file.
A consistent file is not a guarantee of any customs outcome, and this note does not offer one. It is a practical control: when an agent asks for a description, a model list or a packing detail, there is exactly one current version to send. That is also why per-market document files are worth keeping separately for buyers serving more than one destination.
GATE 05Abbreviation rules for long model codes
A shortened code is only safe if the rule is written down.
Print areas on small labels are limited, so workshops sometimes shorten a model code. If the buyer has approved an abbreviation rule, write it into the artwork master and make sure the full code still appears on the packing list and the datasheet. Without that rule, a carton cannot be matched to a document. A case-pack specification is where the rule belongs.
GATE 06One folder per destination market
Shared product masters, separate document versions.
A buyer serving several markets can reuse the model codes and pack quantities while keeping declared descriptions, mark languages and document fields apart. The separation should be visible in the folder name and in the version reference, not implied. Per-market document files and a neighbouring country guide show how the structure travels.
GATE 07Questions buyers ask before the file is released
Do you assign HS codes or duty rates on this page?
No. Classification and any related charges are decided by the importer's agent. The page describes how to keep the supporting documents consistent.
What is a header description versus a line-level description?
The header is the declared consignment wording; the line-level attachment lists the models and cartons. Both are versioned together. The field checklist shows where they sit.
Can a shortened model code appear on a carton?
Only if the abbreviating rule is agreed at the brief stage and recorded in the artwork master, so the carton can still be matched to the datasheet.
Who confirms the declared description?
The importer's appointed agent. The importer of record is normally settled at the same time.
Does consistency matter if the goods are correct?
Yes. A receiving count and a document review both rely on the descriptions matching the physical cartons.
Is there a timeline or a fee in this note?
No. No timing, cost, duty figure or approval outcome is written into the content.
