info@cinosourcing.com
SHEET 01Fabric and canvas are specification fields
Describe the surface and the edge, not a remembered feel.
A generic phrase about kit contents does not identify a reorder line. The component sheet exists so the second order uses the same words as the first. Specification sheet is the parent template.
SHEET 02Thread family and put-up format
Write the format and the rule for change.
| SOURCE FIELD | WHAT THE BUYER STATES | WHY IT GOES ON THE SHEET |
|---|---|---|
| M01 / Thread | Thread family and put-up format stated per design. | A substitution without a rule creates a different kit. |
| M02 / Shades | Who selects shades and who approves a replacement. | The buyer owns this field. Artwork brief. |
| M03 / Needle | Included or listed separately, with a reference. | A separate line is easier to reorder. Replenishment carton. |
| M04 / Pack | How components are grouped inside the bag. Private-label packaging. | State this field on the buyer's sheet. |
Substitution rules belong on the sheet, not in a later email. If a shade is replaced, the approval is recorded on the sample and the revision is noted. Sample approval gates covers the record.
SHEET 03Component checks before packing
Check the kit sheet, not a remembered sample.
A first assembled kit is the cheapest place to catch a mismatch. First-article inspection and pre-shipment inspection are the two working notes buyers use.
SHEET 04Reorder references that survive a second order
A reference that changes between orders is not a reference.
When all four agree, a restock order can be written in one line. A restock checklist and repeat order notes show the buyer-side process.
SHEET 05Where component records sit
Keep the component sheet separate from the artwork file.
The component guide does not set fabric grade numbers, colour codes or certificate claims. Those values come from the buyer's approved file and sample. Per-market documents keep destination wording separate.
SHEET 06Questions buyers ask before the kit sheet is released
What does this page specify?
Which fields belong on a fabric and thread component sheet. It does not set material grades, colour codes or performance values.
How should a thread substitution be handled?
Agree a rule in advance, record any approved change on the sample and note the revision on the sheet.
Is the needle part of the kit?
That is a buyer decision. Record a yes or no so the first kit can be checked against it.
Where do reorder references go?
On the component sheet, the bag, the carton mark and the replenishment list, using the same design reference.
Can a stamped kit use the same component sheet as a counted kit?
No. They share the sheet names but not the surface preparation and chart fields.
Are there prices or minimums?
No. The guide defines information fields; commercial terms are confirmed in a quotation.
SHEET 06Writing the first component sheet
Start with the lines your customers reorder most.
A short first sheet is better than a long guess. Specification sheet is the parent template.
