STAGE 01Two acceptance records, one file
The second record should be able to refer back to the first.
A site acceptance record that cannot name the factory test it follows is hard to interpret. If a behaviour changes between the two, the file should show whether the scope, the parameter set, the utility connection or the installation changed. That is why the equipment identifier and the scope reference are shared fields rather than separate paperwork. A specification sheet is the usual home of the scope, and an inspection report structure from another category shows the same evidence discipline.
STAGE 02What the factory test should prove
Agree the observation list before anyone runs a machine.
| LEDGER LINE | FIELD THE BUYER STATES | WHY IT GOES IN THE FILE |
|---|---|---|
| Observation | What the buyer wants to see: assembly state, run behaviour, cleaning access, interface signals, record output. | Write observations, not performance claims, and name the scope line each one belongs to. |
| Material | What representative product or test condition the buyer will provide, including a difficult case where the product varies. | Testing only the easiest condition gives a weak basis for a line decision. |
| Evidence | Which dated images, readings, parameter printouts and identifiers are kept, and who files them. | Evidence should be legible and tied to the equipment identifier. First-article inspection. |
STAGE 03What the site acceptance should prove
The line now has real connections and real neighbours.
Most differences between a factory test and a site acceptance are interface differences, not equipment defects. A filler that behaved correctly alone may behave differently when the upstream conveyor stops and the downstream cartoner pauses. Recording the buffer rule and the signal behaviour at site acceptance keeps that distinction visible. The conveying and handling family owns those interface fields.
STAGE 04Parameter and firmware versions
A parameter change without a revision is an invisible engineering change.
The general rule is already documented on this site in engineering change control and sample approval and change control. A food line adds one complication: cleaning and changeover steps are also stored as settings in some plants, so those should sit in the same register as the machine parameters.
STAGE 05Spare parts and service records
An acceptance file should already describe the first reorder.
| LEDGER LINE | FIELD THE BUYER STATES | WHY IT GOES IN THE FILE |
|---|---|---|
| Part | The reorderable reference and the assembly it belongs to. | A description by appearance is not a part reference. |
| Revision | The machine identifier and brief revision the part was approved under. | This is what lets a later reorder match the installed machine. |
| History | The dated replacement or repair note and the person who filed it. | A service history is only useful when it can be retrieved against one machine. |
A service record and a spare list should use the same references. The packing line spare kit and repeat-order spare planning show how those references are kept alive across a replenishment cycle, while the consolidation note explains how the first spare lines travel with the equipment load.
STAGE 06Who owns the file after sign-off
One owner replaces every previous version.
STAGE 07Questions buyers ask before the line brief is released
What is the difference between FAT and SAT on a food line?
FAT is the record of what was observed at the workshop before dispatch; SAT is the record of what was observed at the plant with real utilities and adjacent machines. Both should share one equipment identifier.
Do you set the acceptance criteria?
No. The buyer and their engineer write the observation list and the acceptance values. The RFQ worksheet is where the scope is defined.
Should representative product be used in a factory test?
That is a decision for your team, and a difficult case is often more informative than an easy one. A first-article inspection note describes the evidence structure.
How do we handle a control change after sign-off?
As a controlled revision with an owner, an updated parameter set and a note in the acceptance file. Engineering change control is the general method.
Are these records compliance certificates?
No. They are the buyer's own acceptance records. Applicability, standards and approvals remain with you and your appointed agent.
Where do spare part references come from?
From the original brief. The consolidation note explains how the first spare lines travel, and the replenishment kit shows the reorder view.