info@cinosourcing.com
S01Records versus marketing claims
S02What a sweep report should identify
The numbers themselves come from your drawing and the measurement, never from a marketing page. For assemblies, see RF cable assemblies; for backplane parts, see backplane connectors.
S03Visual and dimensional checks
S04Lot traceability in the packing list
S05When an independent check is worth adding
For a first production run, a critical application or a high-value mixed order, buyers often add an independent check at the factory before shipment. We record it as a separate line in the file so it is clear which measurements came from the factory and which came from the independent party. Component exposure is tracked separately in BOM component risk, and documentation boundaries are in electronics documentation.
S06How the file travels with the shipment
| Document | Created before | Travels with |
|---|---|---|
| Specification sheet | Quotation | Order record |
| Golden sample record | Production | Order record |
| Measured test record | Balance release | Shipment file |
| Dated inspection photos | Balance release | Shipment file |
| Packing list and carton marks | Loading | Shipment file |
The same structure supports repeat orders: the next batch calls the same revision and produces the same file. Consolidation details are in consolidated shipment planning, and the wider lane is the RF interconnect pillar.
Do you publish performance figures?
No. Acceptance lines come from your drawing; measured values belong in the test record.
Is the record a compliance certificate?
No. It is a measurement and inspection record. Compliance conclusions stay with your team.
Can we choose what gets measured?
Yes. The inspection scope is agreed before production and named in the order file.
Do you provide photos?
Yes. Dated photos of representative units, labels and packing units are part of the file.
What if a result misses the acceptance line?
It is recorded and raised before the balance is released, not after the goods arrive.
Can an independent party inspect?
Yes, on first runs or critical orders. That check is listed as a separate line in the file.
