S01Why a complete sheet shortens quoting
A supplier reading only an interface name has to guess the cable, the plating, the operating band and the acceptance method. Two factories will guess differently, and the cheaper quote is usually the one that assumed less. A written specification sheet removes that gap before any price is discussed.
S02Interface and gender
S03Electrical acceptance criteria
These are acceptance lines, not performance promises from us. Measured values belong in the test record; we do not publish figures or issue compliance conclusions.
S04Mechanical and environmental lines
| Field | What to state | Where it is recorded |
|---|---|---|
| FIELD 09 Length and tolerance | Finished length and the measuring reference point | Approved drawing revision |
| FIELD 10 Orientation | Right-angle clocking, keying, strain relief | Golden sample photo |
| FIELD 11 Environment | Temperature, sealing, vibration, plating | Specification sheet |
| FIELD 12 Commercial | Quantity tiers, packing unit, label, destination | Purchase order and packing list |
S05Quantity tiers and packaging
Larger equipment orders use the same structure in the equipment specification template, and distributor assortments use the line sheet checklist.
S06What we return with the quote
Where a BOM line carries substitution or end-of-life exposure, we add component risk checks before the first production run. Project orders that mix these parts with racks and optical hardware are covered in consolidated shipment planning.
Can I send a photo instead of the sheet?
You can start with a photo, but we convert it into the twelve fields and get your confirmation before quoting.
Who sets the acceptance limits?
Your engineering or incoming-inspection team. We record them and ask the factory to quote against them.
Do I need all twelve fields for a repeat order?
No. A repeat order calls the approved revision number and the new quantity tier.
Can the sheet cover several connector families?
Yes. List each interface pair as its own line on the same sheet.
What if the factory proposes an alternative?
It is recorded as a change and goes back through sample approval before production.
Where do I send it?
Use the contact block at the top or bottom of this page with your drawing and quantity tiers attached.