A supplier that answers yes to every requirement is not the same as a supplier that can explain its manufacturing route. These are the six checks we make against the released brief before a line enters repeat production.
Qualification is not a one-off gate. Early batches are inspected more closely, records are kept per revision, and a change to process, site or a critical sub-supplier sends the line back into review. Pre-shipment inspection is where that record becomes visible before the goods leave China.
What the first article should prove
A sample approved for form and fit may still need more evidence before the full series is released. Deviations are recorded, not quietly accepted. Pre-shipment inspection then judges each batch against the agreed criteria before loading.
The boundary we work to
Short answers
Do you hold quality-system certificates?
No. Those belong to the factory. We check that the certificate a supplier shows covers the intended site and activity, and keep the record on file with the order.
Can we use our own supplier questionnaire?
Yes. Send it with the released brief and we will work to it. A consistent questionnaire across every shortlisted factory is what makes the responses comparable.
What happens when a process changes?
It goes back into change control. Material, machine, tooling, site and critical sub-supplier changes should be approved in writing before the next batch, with the revision updated on the order and inspection report.
We reply with the factories behind each line, the documents they can evidence, and a written, itemised all-in quote.