PROJECT NOTE 03 / EVIDENCE PACK
SCOPE
Document verification
LEVEL
Component and assembly
METHOD
Field-by-field check
OWNER
Importer and project engineer
A certificate image on a quotation is the start of verification, not the end of it. Copied logos, cropped certificate scans and supplier declarations may all be genuine, but they still have to be tied to the exact manufacturer, product family, standard edition and issuing body for the part being quoted. This page is a field-by-field checklist for electrical components bought from China for a project order.
verify electrical component certificatesUL certificate number lookupNRTL listing vs CEIEC 61439 design verificationtype test reportdeclaration of conformityequivalent component approval
01
Six fields to request for every certificate
Certificate number
The identifier that can be looked up, not a marketing reference.
Issuing body
The NRTL, certification body or test laboratory named on the document.
Scope and model coverage
Which product series, ratings, accessories and manufacturing sites the certificate actually covers.
Standard and edition
For example UL 489, IEC 60947-2 or IEC 61439-2, with the edition or version stated.
Issue date and validity
Including any expiry, suspension or follow-up service status where applicable.
Public verification route
The online directory or written confirmation path, plus a contact at the issuing body if needed.
Then compare the quoted model, ratings, accessories and manufacturer name against what the certificate says. A certificate for a product family does not automatically cover a variant with a different voltage, frequency, interrupting rating or terminal configuration. Where the project needs it, request the full relevant test report or an approved report summary rather than a single page.
02
Use the terms precisely
Third-party evidence
• NRTL listing or certification, identified by a mark and a verifiable certificate.
• CB Scheme test reports and accredited laboratory type-test reports.
• Factory follow-up service arrangements where a listing requires ongoing inspection.
• Design verification records for a completed assembly under IEC 61439.
Manufacturer declarations
• A declaration of conformity is the manufacturer stating compliance with named directives.
• CE marking is not a test laboratory or independent third-party certification.
• A supplier self-declaration letter is useful context, not proof of listing.
• A test summary written by the supplier should be backed by the underlying report.
THE DOCUMENT YOU NEED DEPENDS ON THE DESTINATION
A US project following NEC and requiring NRTL listing needs different evidence from an EU project working with LVD, EMC, RoHS and a declaration of conformity. Ask the importer, the project engineer and the authority having jurisdiction which evidence is required before comparing supplier offers.
Our voltage and standards guide explains how the two systems map to different grid parameters.
Be careful with the phrase certified to a standard. Ask which standard, which edition, which body, which model range and whether the document can be verified independently. Precision in the RFQ produces precision in the reply.
03
Which standard attaches to which component
Moulded-case circuit breakers
UL 489 in North American projects; IEC 60947-2 in IEC projects. UL 1077 supplementary protectors are a different product class.
Industrial control panels
UL 508A, with Supplement SA often referenced for component suitability; factory follow-up service may apply.
Switchboards and MCCs
UL 891, UL 845, UL 1558, UL 67 or UL 1008 depending on the equipment type.
Low-voltage assemblies
IEC 61439-1 general rules and IEC 61439-2 for the assembly, verified as a whole.
Power capacitors
IEC 60831-1 and IEC 60831-2 for shunt capacitors; UL 810 is also referenced in North American practice.
Chinese domestic baseline
GB/T 7251 and GB/T 14048 are commonly cited and are closer to IEC-style practice.
The important boundary: a component certificate does not certify the finished panel. Under IEC 61439 the assembly is design-verified for temperature rise, dielectric properties, short-circuit withstand, protective circuit effectiveness, clearances and creepage distances, and mechanical operation. Routine verification then covers wiring integrity, insulation, control sequence and correct step switching. Our APFC component list maps those checks to the individual lines in a capacitor panel.
04
The design verification and routine test file
•Ask whether the assembly evidence was produced by testing, comparison with a reference design, or a validated calculation or assessment where the standard allows it.
•Request the declared ratings that sit behind the evidence: current, voltage, IP degree, prospective fault level and form of separation.
•Request routine test records for wiring, dielectric checks, protective circuit continuity, functional sequence and nameplate inspection.
•Agree the factory acceptance test scope at quotation stage so the documentation and the inspection records refer to the same build.
Where a project calls for arc-flash labelling, the study belongs to the project engineer rather than the panel supplier. Keep that boundary clear in the responsibility matrix; it avoids a document gap appearing at commissioning.
05
Approving an equivalent without voiding the file
An alternative part can protect supply, but an uncontrolled substitution can change thermal behaviour, protection, mounting or compliance. Use form, fit and function as the minimum review frame: physical dimensions, mounting, terminal interface and accessory positions; the real interface with rails, busbars, wiring, enclosure and assembly layout; and the electrical characteristics, protective performance and verified application.
01
Supplier declares the substitution
The reply lists the original part, the proposed part, changed ratings and dimensions, the standard basis, accessory changes and any identified risk.
02
Engineering reviews in writing
The project engineer approves or rejects the change before it enters the BOM. A price comparison is not an approval.
03
Documents are re-checked
Certificates, nameplates, drawings, labels and test records are updated to the approved part, then confirmed before release.
06
Engineering change notices after approval
Even an approved part can change after release. Tooling modifications, terminal material changes, internal component swaps, a production site transfer, a standard update or a label change can affect the product record or the panel approval file. Agree an ECN rule: which changes require notice, the notice period, the documents, samples or re-verification required, who approves, and how pre-change and post-change stock is identified. For repeat projects, put it in the supply agreement rather than handling it order by order. our electrical infrastructure project page describes how the document pack is kept together across a multi-supplier order.
07
The document pack to request in the RFQ
Certificate numbers, issuing bodies, scope, editions, dates and public verification routes for every listed component.
Full type-test reports or approved summaries, plus design verification evidence for the finished assembly.
Declaration of conformity, technical file references and label or nameplate samples in the required language.
Approved single-line and control wiring diagrams, a technical deviation list and the FAT scope.
Spare parts list, packaging and marking requirements, and the ECN rule for repeat orders.
We do not issue certificates or determine compliance. What we do is request the documents from the factory, check that they correspond to the quoted model and ratings, flag gaps before the order is released, and keep the checked file with the shipment. Our pre-shipment inspection service and supplier verification process explain how those checks are carried out. The final determination stays with the importer, the project engineer and the authority having jurisdiction.
Our quoted price already includes our margin. There is no separate sourcing fee or commission added on top, and we do not set a strict MOQ of our own. Factory minimums vary by specification and are confirmed in writing before any deposit.
Want the document list checked before you commit?
Send the part numbers and the approvals your market requires. We return a written list of the certificates and reports we will request, and flag anything that cannot be verified.
This page is general procurement guidance, not engineering design advice or a compliance determination. Ratings, standards and approvals must be confirmed by the project engineer, the importer and the authority having jurisdiction for the destination market.