A quote is only useful if you can put it next to another one. These are the fields we ask every factory to price against, so the comparison is between the same goods rather than two different assumptions.
The RFQ fields
| Field | Why it belongs in the brief |
|---|---|
| Product family and specification | Material, size, finish and the standard named in your project brief |
| Model and approved sample reference | So the price describes the unit that will actually be made |
| Quantity and pack size | Volume pricing is quoted against the quantity on the brief |
| Destination market | Determines which documents, labelling and markings are required |
| Documents required | Identified before production, then checked against the exact model and lot |
| Branding, packaging and language | Artwork, cartons, labels and manuals agreed before production |
| Inspection criteria | The standard the dated photo report is judged against |
| Target delivery date | One date for every supplier on the order |
Why the all-in quote still lists every line
Our quoted price already includes our margin. There is no separate sourcing fee or commission added on top. That does not mean a single unexplained number. Material, tooling, processing, finishing, inspection and shipping are itemised within the one all-in quote, and every line is confirmed in writing before any deposit. The detail is what lets a procurement team compare offers built on the same brief.
What happens when a field is missing?
It is marked as open in the brief rather than filled with an assumption. A missing pack size or an unstated labelling requirement changes both the price and the documents, so guessing it produces a number that cannot be audited later. Our sourcing guide explains the workflow.
What should we send with the RFQ?
The specification or drawing, expected volume, destination, the documents your market requires, branding artwork and one target delivery date. If several categories are involved, put them in one list so they can be held to the same date. See the full sourcing services.
Short answers
Do you publish minimum order quantities?
No. Factory minimums vary by product, material and tooling. We confirm the real figure in writing for your specification before any deposit and quote volume pricing against your quantity.
Can one RFQ cover several categories?
Yes, and for a project order it should. One list, one delivery date and one document set is easier to audit than separate enquiries that drift out of alignment.
Do you issue the documents on the list?
No. Those come from the factory or the licensed party. We request them before production, check their scope against the exact model and lot, and keep them on file with the shipment.
